Post-Occupancy Services
A building’s design has an impact on all working & living factors, whether direct or indirect. Most of these factors can be theorized and strategized during the pre-construction phase, however, hard data can only be attained post-construction. By studying these figures, our team can find ways to improve the existing building and implement a cost effective road map for constant improvement.
Once the evaluation process is underway, our team studies the building based on metrics like:
- Energy and Water use
- Waste generation
- Traffic flow
- Air temperature, humidity, and other environmental conditions
- Sound level
- Artificial and Natural lighting levels
- Overall aesthetics
- User/Tenant satisfaction
- Wayfinding
- Workflows
- Benchmarking
- Building features analysis
- Environmental ratings